Modular pile breaker

A ring of steel modules squeezes the head of a large bored pile; above, the concrete is split and the reinforcing bars show through; the yellow excavator in the background, other piles around in a large excavation. Computer-generated image.
The ring of modules squeezes the head of the bored pile:
the concrete splits, the bars appear.
Around it, other piles wait to be cropped.
Computer-generated image.

On a bored pile site, every head stands above the cut-off level and has to be cropped before the pile caps or ground beams.
The modular pile breaker surrounds the pile with a ring of modules that shatter the concrete.
Modules are added or removed to change diameter.

Other names for this tool: module pile breaker, pile cropper, pile crusher, pile head cutter, large-diameter pile breaker, pile cutter (English term).

The essentials
Family
Demolishing and breaking
Classes
20 to 40 t
Piles
Round, bored, from 600 to 1,800 mm
Modules
8 to 18 depending on the diameter, added or removed on the same tool
Principle
Compression, without percussion; the starter bars remain

See the whole family →

01 Use

What it is for

A bored pile is cast higher than the cut-off level, then cropped:
its head is cut down to the right height.
The starter bars are kept, to tie in with the pile cap or the ground beam.
On large diameters, with a jackhammer or a hydraulic breaker, this work is slow, noisy, and it makes the pile vibrate.

The modular pile breaker does this work from the excavator.
Its modules, assembled in a ring around the pile, each push a tooth against the concrete:
it shatters under compression, without percussion.
The output claimed by the manufacturers is in the order of 30 to 40 piles per 8 h day, depending on the diameter and the concrete.

A ring of modules

Each module carries a ram and a tooth.
Linked together, the modules form a ring that closes around the pile head.
The rams squeeze together:
the concrete splits, then breaks off in pieces.

One tool, several diameters

With 8 to 18 modules depending on the diameter, the ring covers round piles from 600 to 1,800 mm.
To move from one diameter to another, modules are added or removed:
the same tool serves across the whole site.

The starter bars

The concrete goes, the bars stay standing above the cut-off level.
They are ready to tie in with the pile cap or the ground beam.

For small and very large piles

Below 600 mm, for precast piles or small bored piles, see the compact pile breaker, for 6 to 16 t excavators.
For very large piles, a large-format four-ram version also exists:
it is chosen in the study.

A ring weighing several tonnes hangs at the end of the arm. The tool weighs from 2.2 to 5.9 t depending on the model:
the lifting capacity is read on the excavator's load chart, at the actual reach.
During clamping, nobody stands at the foot of the pile.

02 Key technical data

On which machine?

The modular pile breaker fits a 20 to 40 t excavator.
It weighs from 2.2 to 5.9 t depending on the model.
It works suspended from the excavator's arm or hook:
the suspension is specified in the study, and the load is checked on the machine's load chart.

What the tool does

It takes round piles from 600 to 1,800 mm, with 8 to 18 modules depending on the diameter.
Each module pushes a tooth against the concrete, which shatters under compression; the starter bars remain.
The claimed output is in the order of 30 to 40 piles per 8 h day, depending on the diameter and the concrete.

What is needed on the hydraulic side

It connects to the excavator's auxiliary line and works at 300 bar.
The flow depends on the model:
it is checked in the study.

Figures taken from 3 manufacturers on the market.
Your study sets the exact value for your machine.

How to read these values →

03 Your study

Have your piles and your excavator checked.

Give us the diameter and number of the piles, the height to be cropped and the excavator available.
We set the number of modules, the weight and the flow with you.

What we need to answer you
  • The piles Their diameter, or the diameters if there are several on the site.
  • The number How many piles, and the height to be cropped on each.
  • Your excavator Its make, its model and its tonnage.
  • The auxiliary circuit Its flow in l/min and its pressure in bar.
  • The schedule The time allowed to crop the whole series of piles.

Without these details, the study still begins:
we will ask you for them.

Book an appointment with the specialist

Or call 01 84 16 55 49 · our lines are open 7 days a week, from 7h to 22h.

Written study within 3 working days, once the file is complete.

04 Choice

What determines the choice

  • 01 — The diameters on the site They give the number of modules:
    from 8 to 18 for piles from 600 to 1,800 mm.
  • 02 — The excavator available From 20 to 40 t:
    the tool weighs from 2.2 to 5.9 t depending on the model, and the load chart has the final say.
  • 03 — Modules or four rams The ring changes diameter by changing modules;
    the large-format four-ram version is discussed for very large piles.
  • 04 — The series to be cropped The more piles there are, the more the output counts:
    in the order of 30 to 40 piles per 8 h day, depending on the diameter and the concrete.
  • 05 — The surroundings Near an existing structure or an occupied building, the absence of percussion counts:
    the pile and the ground do not vibrate.
05 Check

What is checked before ordering

  • The auxiliary line It must hold 300 bar; the flow is checked in the study.
  • The lifting capacity The tool hangs at the end of the arm, over the excavation:
    the load is read on the load chart, at the actual reach.
  • The diameters Taken from the drawing, pile by pile:
    they set the modules to be provided.
  • The cut-off level It is read on the drawing and marked on each pile before clamping.