Compact pile breaker

A yellow excavator of about 12 t holds at the end of its arm, hung from a chain, a square steel frame whose horizontal rams break the head of a square concrete pile; below, the shattered concrete reveals the reinforcing bars; other precast piles stand in a row in the excavation. Computer-generated image.
Hanging from the excavator's arm, the frame squeezes the pile head:
the concrete shatters, the bars remain.
Other precast piles wait in the excavation.
Computer-generated image.

After driving or boring, the head of a concrete pile almost always stands above the planned cut-off level.
The compact pile breaker brings it down to level from the excavator, without a jackhammer or a hydraulic breaker.
Four rams squeeze the pile, the concrete shatters, the starter bars remain.

Other names for this tool: pile cropper, pile crusher, pile head cutter, hydraulic pile breaker, pile cropping tool, pile breaker (English term).

The essentials
Family
Demolishing and breaking
Classes
6 to 16 t:
midi-excavators and excavators
Piles
Round or square, from 200 to 600 mm:
precast or small bored piles
Principle
Four rams squeeze the pile:
the concrete shatters under compression, without percussion
Power source
Auxiliary line, 20 to 90 l/min and 250 to 345 bar depending on the model

See the whole family →

01 Use

What it is for

A concrete pile almost always ends up a little higher than the planned cut-off level.
Before pouring the pile cap or the ground beam, its head has to be cut down to the right height:
this is pile cropping.
The concrete is removed, but the starter bars are kept, to tie in with the structure above.

With a jackhammer or a hydraulic breaker, this work is slow, noisy, and it makes the pile vibrate.
The pile breaker squeezes the pile head between four rams:
the concrete shatters under compression, without percussion or vibration.
The bars come out clean, ready to tie in with the pile cap.

Squeezing, not striking

The pile breaker's frame is placed around the pile head.
Its four rams push their teeth against the concrete, from all sides at once.
The concrete gives way under compression and breaks off; the bars stay in place.

Pass after pass

Each pass removes 250 to 300 mm of concrete height.
The frame is lowered by one pass and clamped again, down to the cut-off level.
The pieces fall at the foot of the pile and are picked up with a bucket.

For which piles

The compact model is aimed at round or square piles from 200 to 600 mm:
precast concrete piles and small bored piles.
For large bored piles, from 600 to 1,800 mm, see the modular pile breaker.

Without vibration

No percussion:
no shock wave sent into the pile or the ground, and less noise than with a hydraulic breaker.
That is useful near an occupied building, a utility network or a neighbouring structure.

The cut-off level is marked before clamping. The pile breaker removes whatever it is given:
a pass taken too low cannot be undone.
During clamping, nobody stands near the pile:
fragments of concrete can fly off.

02 Key technical data

On which machine?

The compact pile breaker fits a 6 to 16 t midi-excavator or excavator.
It weighs from 550 to 1,400 kg depending on the model.
It works suspended from the excavator's arm or hook:
the suspension is specified in the study, and the lifting capacity is checked on the machine's load chart.

What the tool does

Four rams squeeze the pile from all sides; the concrete shatters under compression, without percussion.
It takes round or square piles from 200 to 600 mm, depending on the model.
Each pass removes 250 to 300 mm of height; the starter bars remain.

What is needed on the hydraulic side

It connects to the excavator's auxiliary line.
It needs from 20 to 90 l/min and from 250 to 345 bar, depending on the model.

Figures taken from 3 manufacturers on the market.
Your study sets the exact value for your machine.

How to read these values →

03 Your study

Have your piles and your excavator checked.

Give us the diameter and shape of the piles, their number and the height to be cropped.
Add the model of your excavator and a photo of a pile in place:
we choose the model with you.

What we need to answer you
  • The piles Round or square, diameter or side, precast or bored.
  • The number How many piles, and the height to be cropped on each.
  • Your excavator Its make, its model and its tonnage.
  • The auxiliary circuit Its flow in l/min and its pressure in bar.
  • The site The depth of the excavation, the access, and the neighbours to be spared:
    building, utility network, structure.

Without these details, the study still begins:
we will ask you for them.

Book an appointment with the specialist

Or call 01 84 16 55 49 · our lines are open 7 days a week, from 7h to 22h.

Written study within 3 working days, once the file is complete.

04 Choice

What determines the choice

  • 01 — The pile diameter It is what sets the size of the tool:
    above 600 mm, you move to the modular pile breaker.
  • 02 — Round or square The compact model takes both shapes:
    the shape is given for the study, with the diameter or the side.
  • 03 — The excavator available From 6 to 16 t:
    the weight of the tool, from 550 to 1,400 kg depending on the model, is checked on the machine's load chart.
  • 04 — The height to be cropped Each pass removes 250 to 300 mm:
    the height to be removed gives the number of passes per pile.
  • 05 — The surroundings Near an occupied building or a utility network, the absence of vibration counts:
    that is what makes people choose the pile breaker rather than a hydraulic breaker.
05 Check

What is checked before ordering

  • The auxiliary line The excavator's flow and pressure, compared with the 20 to 90 l/min and 250 to 345 bar of the chosen model.
  • The lifting capacity The tool works suspended, sometimes with the arm extended over the excavation:
    the load is read on the load chart.
  • The suspension From the excavator's arm or hook:
    it is specified in the study.
  • The cut-off level It is read on the drawing and marked on each pile before clamping.