Load cell and load limiter
You want to know what you are lifting, to be warned before a limit, or to be unable to exceed it.
Three points decide:
the function wanted, where the device sits, how it is connected to the machine.
A photo of the machine and of its lifting point is enough to start.
the suspended load passes through it, and it displays it.
Synthetic image.
Three functions not to be confused:
measuring the load, warning when a limit approaches, preventing the manoeuvre that would exceed it.
The load cell measures;
only a device designed and connected for it can prevent.
Other names for this tool: lifting load cell, dynamometer, load indicator, load limiter.
- Family
- Handling and lifting
- Machines concerned
- All
- Fitting
- Fitted in line, or installed on the machine
- Power supply
- Depending on the device; the machine's 12 or 24 V on-board electrical system for an installed limiter; power: we calculate it with you for your machine
What it is for
Right: the limiter cuts the movement at the threshold and the arm stops by itself.
What sets them apart:
the load cell informs and assumes that someone looks at the right moment; the limiter is a safety device.
Computer-generated image.
Here under an overhead crane; on an excavator, it is placed in the same way between the lifting point and the load.
Photo:
Friedmannskalle, CC BY-SA 4.0, via Wikimedia Commons.
ring at the top, hook at the bottom, the reading is taken from the needle.
Photo:
Fst76 at German Wikipedia, CC BY-SA 3.0, via Wikimedia Commons, badge and markings removed.
A load cell is placed between the hitching point and the load, or is built into the lifting chain.
It displays what the suspended load weighs.
It is information:
it informs the driver, it does not stop them.
A load limiter monitors the loading of the machine.
Depending on the device and how it is connected, it warns the driver when the limit approaches, or it inhibits the movements that would make the situation worse.
Inhibition only exists if the device is designed for it and connected to the machine's controls:
it is checked in its instructions, it is not assumed.
On a machine used for lifting, this kind of device is not a matter of comfort.
Weighing is not limiting. A load cell well read by an attentive driver replaces no safety device, because it assumes that someone looks and decides at the right moment.
Lifting with an earthmoving machine assumes suitable devices and a periodic inspection:
we supply the part and the information, the conformity of your organisation is yours.
On which machine?
A load cell or a load limiter suits all machines.
It fits in at the hook, or is installed on the machine.
The lifting capacity at the working reach: we calculate it with you for your machine, to be checked in your machine's handbook.
What the tool does
Depending on the device and its connection, it measures the load, gives a warning, or blocks the movements.
The working load limit, the weight and the chosen function: we calculate them with you for your machine.
What is needed on the hydraulic side
It runs on electricity, depending on the device.
A fitted limiter connects to the machine's 12 or 24 V on-board electrical system.
It can also have its own battery.
The voltage and the power: we calculate them with you for your machine.
Figures taken from our models on the market.
Your study sets the exact value for your machine.
Don't have these figures?
A photo of the machine is enough to start.
Have your machine checked.
Tell us whether you want to know what you are lifting, to be warned before a limit, or to be unable to exceed it.
These three requests do not lead to the same equipment.
- Your machine Its exact make and model.
- What is fitted What equips the machine today.
- The on-board electrical system Its voltage: 12 or 24 V.
Without these details, the study still begins: we will ask you for them.
Or call 01 84 16 55 49 · our lines are open 7 days a week, from 7h to 22h.
Written study within 3 working days, once the file is complete.
What determines the choice
Each point says what changes the choice.
The values, we check them in your carrier's instructions and in the tool's.
-
01 — Measure, warn or prevent
The question to settle first:
each function calls for a different device and a different connection. -
02 — The intended use
Invoicing a load, recording a loading operation or making a lift safe:
these are not the same instruments. -
03 — The place in the chain
Between the hitch and the load, or built into the machine:
the accuracy and the robustness are not the same. - 04 — Legibility from the cab A displayed value that the driver cannot see is of no use.
What is checked before ordering
-
The exact use expected
Information, traceability or safety:
say it clearly, that is where everything is decided. - The connection A device that acts on the movements is connected to the machine, not only to the tool.
-
Checking and calibration
A measuring instrument drifts;
a safety device is checked and recorded. -
The requirements specific to your activity
They depend on what you do and they bind you:
we supply the part, not the conformity.
- Family
- Handling and lifting
- Trade
- Railways
- Compatibility
- The seven criteria in detail →