Skip to content
À LA PELLE, the specialist in hydraulic excavator attachments Who is Arnaud Dufour
EN

The site is written in French.
The languages marked here are translated by us:
the French version prevails.

Français Русский English Italiano Deutsch Español
Wear parts

Steel tracks

Steel track chain: links assembled by pins, onto which the pads are bolted
A chain of links, and pads bolted onto it:
that is what makes it repairable part by part.
Illustration based on an existing product.

Where rubber cuts, steel holds.
In exchange, it marks the ground, it is heavy, and it makes noise:
it is a choice of ground, not a choice of quality.

Other names for this part: steel track, metal track, steel undercarriage, track chain.

The essentials
Family
Wear parts
Classes or machines concerned
All of them, depending on the undercarriage
Fitting
As an original-equipment replacement (undercarriage part)
Power source
None

All wear parts →

01 Use

What it is for

On the left, steel tracks hold up on rock and on demolition fill. On the right, on finished asphalt, the steel pads mark the surface. Computer-generated image.
steel tracks hold up on rock and on demolition fill on finished asphalt, the steel pads mark the surface
Left: steel tracks hold up on rock and on demolition fill.
Right: on finished asphalt, the steel pads mark the surface.
What sets it apart:
it is a repairable part, where a rubber track is replaced whole.
Computer-generated image.

A steel track is a chain of links onto which pads are bolted.
That construction makes it a repairable part:
a link, a pad, a pin are replaced without changing the whole.

It is the choice for ground that cuts — rock, scrap, demolition fill — and for work that lasts.
On a finished surface it is to be ruled out, or fitted with over-pads.

A steel track does not wear on its own: it wears the sprocket and the rollers, and lets itself be worn by them.
Changing the track without looking at the rest of the undercarriage means buying twice.

02 Key technical data

On which machine?

A steel track fits machines from 1 to 65 t, depending on the chassis.
It is fitted to replace the original track, as an undercarriage part.

What the tool does

Its pads range from 220 to 1 200 mm wide.
A wide pad bears on soft ground; a narrow one gives stability and traction on hard ground.
The weight of the part: we calculate it with you for your machine.

What is needed on the hydraulic side

It needs no hydraulic connection: it is a part of the machine.

Figures taken from 4 models on the market.
Your study sets the exact value for your machine.

How to read these values →

03 Your study

Have your machine checked.

Tell us your machine model, the pitch and the pad width read on site.
Tell us too what ground it works on most often.

What we need to answer you
  • Your machine Its exact make and model.
  • What is fitted What equips the machine today.
  • The work What the machine is used for.

Without these details, the study still begins: we will ask you for them.

Book an appointment with the specialist

Or call 01 84 16 55 49 · our lines are open 7 days a week, from 7h to 22h.

Written study within 3 working days, once the file is complete.

04 Choice

What determines the choice

  • 01 — The pitch and the number of links They belong to the undercarriage, not to the commercial model.
    Two machines of the same tonnage do not necessarily have the same pitch.
  • 02 — The pad width Wide to float on soft ground, narrow for stability and traction on hard ground.
    Too wide on rocky ground:
    the pads bend.
  • 03 — The type of pad Single, double or triple grouser:
    the single grouser digs in and grips, the three grousers spare the ground.
  • 04 — The sealing of the pins Greased chains or sealed-for-life chains:
    the difference is paid for at purchase and recovered in service life.
05 Check

What is checked before ordering

  • Record the pitch, the pad width and the number of links on the track fitted.
  • Measure the wear of the sprocket:
    its teeth sharpen to a point when it is finished.
    A new track on it will be destroyed.
  • Count the cracked or bent pads — beyond a few, the chain has worked beyond its width.
  • Plan for the handling:
    a steel track for a 20 t machine is taken off by two people and a machine, not by hand.
To go further
A question about an attachment? 01 84 16 55 49 Send my photos